PSU buying advice · Timing your project
An estimated ship date is only one part of an office furniture schedule. Your team needs to know when the furniture will be installed and ready to use.
At Panel Systems Unlimited, timing depends on whether you choose used inventory or new furniture, the size of the order, your location and the installation requirements. Start with your target occupancy date so we can work backward through those steps.
For used orders of 10–35 workstations, our normal warehouse preparation time is 5–10 business days. That means ready to ship or ready for local installation—not a promise of completed installation within that period. Transportation and the installation appointment must also be planned.
How long does PSU take to prepare used cubicles?
| Order size | Normal preparation expectation |
|---|---|
| Fewer than 10 workstations | Can be faster than the standard 5–10 business days. Ask us to confirm timing for your specific order. |
| 10–35 workstations | Usually 5–10 business days to prepare for shipping or local installation. |
| More than 35 workstations | Can take up to 15 business days under normal business levels. |
These are normal operating ranges. Busy periods or project-specific requirements can take longer. Having the inventory in our warehouse does not eliminate the work required to pull the components for your layout, clean them, touch up paint, replace broken parts and inspect the order.
We begin pulling a used order after signing. It will not leave our dock until we have received the deposit. Ask your salesperson to confirm the preparation and release dates for your project rather than treating the general ranges as a delivery commitment.
What changes when you order new office furniture?
New furniture lead times vary by manufacturer, product, finish, quantity and whether the items are stocked or made to order. PSU does not order new furniture until the deposit is received.
- Quick-ship selections: Programs such as Office Star’s Systems in Stock can offer eligible products that ship in five days. Confirm current eligibility, available quantities and the manufacturer’s ship estimate before choosing an option around a deadline.
- Stocked COE and NDI products: We normally receive two trucks a week from these suppliers. When a selected item is in stock, we typically receive it within a week. That is arrival at PSU, not a promise of installation at your office within a week.
- Other new selections: AIS, Open Plan and our other manufacturers have product-specific schedules. We confirm the relevant lead time with the quote; a published program guide is not a reservation of stock or a guaranteed delivery date.
A particular finish or configuration can change the schedule. If the deadline matters more than a specific look, tell us which details are flexible so we can compare realistic alternatives.
Separate the four dates in your furniture plan
- Order and preparation: Confirm the scope, quantities, layout and required payment. Used furniture is prepared from inventory; new furniture follows the manufacturer’s order process.
- Ready to ship: The furniture is prepared or the manufacturer releases it. It may still need transportation to PSU or your project location.
- Delivery: The shipment reaches the agreed receiving location. Confirm who receives it and where it will be held if installation is later.
- Installation and occupancy: Furniture is assembled and placed, follow-up items are identified, and separately arranged power, data and other work are coordinated before staff use the space.
For an out-of-town project, freight and the local installation team’s schedule are additional pieces of the plan. Once your deposit is paid, PSU’s dedicated installation coordinator is your point of contact for furniture and installation matters.
What can slow a project down?
Late layout changes, an unavailable finish, restricted building access, an unreserved elevator or an unfinished room can all affect the plan. A mixed order may also contain items with different arrival dates. Discuss whether everything should arrive together or whether a phased installation makes sense, including any additional delivery or installation cost.
Before committing to an opening date, confirm the building’s receiving rules and any electrical or data work with the responsible providers. Give us an accurate floor plan, the installation address, your headcount and a clear distinction between your preferred date and a deadline that cannot move.
Can you furnish an office in under a month?
It may be possible for some projects, especially when suitable inventory, site access and installation capacity line up. It is not a blanket promise. The useful answer is a project-specific schedule showing the furniture choice, preparation or manufacturer lead time, transportation and installation appointment.
For related ordering details, see our office furniture FAQ. For the layout decisions that affect the component list, use our cubicle size and layout guide.
Give us the date your office needs to be ready
Send your location, headcount, floor plan and target occupancy date. Tell us which furniture and finish choices are flexible so we can build a workable proposal and schedule.
Request a project quote